Before

 After

Project Goal

Complete replacement of the automatic transfer switch (ATS) utilizing existing infrastructure to improve system function and meet current standards.

Project Scope

  • Remove all electrical sources of power to the ATS  and lock out/tag out for safe disassembly
  • Identify and label all existing power and control wires in the  ATS enclosure
  • Remove all existing components (contactor panel, controller, relays, transformers, etc.) in the ATS enclosure
  • Clean and prepare the interior of the enclosure
  • If necessary, new mounting framework will be fabricated and installed to support the new power panel
  • The cabinet door will be cut to accommodate through mounting of the new microprocessor based controller
  • A custom designed face plate will be utilized on the outside of the door to provide a factory like appearance. Fill all unused holes on door with hole plugs
  • Install new contactor panel and controller onto the enclosure
  • Reconnect power cabling and control wiring to the appropriate termination points.
  • Restore all electrical sources of power to the ATS 
  • Set and verify all controller set points and functional settings
  • Complete commissioning and functional testing of new ATS to ensure proper operation
  • Provide on-site training to appropriate personnel

Project Highlights

  • Project is cost and labor saving to the customer due to utilization of existing enclosure, conduit, and wiring
  • New ATS will have the latest technology and features for integration into building and elevator controls
  • New ATS will significantly reduce the amount of components necessary to perform the same function as the previous ATS
  • Final visual appearance will be that of a factory production unit.  
  • Customer will realize minimal down time due to appropriate load transfer planning to alternate power source if necessary
  • Project completed on time and within budget