Project Goal

Complete overhaul of current health care facility back-up power system, to improve system function and satisfy all required codes

Project Scope

  • Remove all obsolete ASCO syncropower paralleling switchgear control components
  • Identify, label, and document all existing control wires between the SWGR and all ATS’s
  • Install new engine sensors, new governor actuators, and new static exciters.
  • Install new starters, and battery system, 32VDC to 24VDC
  • Install new paralleling breakers
  • Set trip units based on calculations from appropriate coordination study
  • Install new generator control system
  • Install and wired/programmed manual and automatic load shed controls
  • Install new governor controls
  • Identify and correctly terminated wiring to indicate ATS position, for all ATS’s in the hospital
  • Install new remote annunciators
  • Tune static exciters and governors for proper operation
  • Complete commission testing of system
  • Verify that load control works as designed
  • Verify all protective functions
  • Verify all auxiliary systems
  • Provide full on-site training to hospital staff
  • Complete and provide as-built drawings and project binder, including component manuals and documents – Binder also includes a copy of the most recent program, from each control system

Project Highlights

  • Customer realized zero down time due to appropriate load planning
  • Satisfied very specific and unique site requirements
  • Project completed on time and within budget
  • Managed minimal disruption to customer operation due to proper planning and execution
  • Custom fabrication of bolted pressure switch
  • Appropriate contingency planning elements installed for future emergency situations