Remote Radiator Replacement

Remote Radiator Replacement Project Goal Complete replacement of leaking remote radiator assembly. Project Scope Replace leaking radiator assembly, original to the generator from the late 1980’s Replacement radiator assembly included new fans, motors, expansion tanks, and support structure Replaced engine coolant, engine thermostats, miscellaneous gaskets, hardware, and strut on radiator assembly and ancillary controls Collaborate [...]

Redundant Portable Generators

Redundant Portable Generators Project Goal Provide Redundant Portable Generators Project Scope Supply and connect (2) 800kW portable generators, to operate as prime power in parallel, providing redundant sources of power in the event of a failure Provide reliable source of power for critical facility equipment during a scheduled equipment maintenance window Utilize customer’s existing fuel [...]

Radiator Replacement

Radiator Replacement Your team did a great job installing the radiator over the weekend. It was a big job but the boys pulled it off like pro’s. Please thank them for a job well done.On-Site Chief EngineerChicago, Il. Project GoalComplete replacement of obsolete radiator assembly from defunct radiator manufacturer. Project Scope Replace leaking Perfex radiator [...]

ATS Retrofit

ATS RetrofitBefore  After Project GoalComplete replacement of the automatic transfer switch (ATS) utilizing existing infrastructure to improve system function and meet current standards. Project Scope Remove all electrical sources of power to the ATS  and lock out/tag out for safe disassembly Identify and label all existing power and control wires in the  ATS enclosure Remove [...]

Emergency Rental Install

Emergency Rental Generator Install Project GoalInstall Emergency Rental Generator Project Scope Supply and connect portable generator Install exhaust stack to portable generator to raise diesel exhaust discharge above roofline Test and commission portable generator Project Highlights Portable generator delivered on schedule Delivery and connections completed in less than eight hours Access to city alley not [...]

Medium Voltage Load Testing

Medium Voltage Load Testing Project GoalPerform generator level II maintenance to include OEM specified load bank testing on 22 medium voltage 13.8kV electric plants Project Scope Secure necessary in-house equipment (i.e. loadbanks, cabling, etc) Secure necessary step down transformer and medium voltage cabling Logistically coordinate delivery and set up of all equipment by field service [...]

Generator Controller Retrofit

Generator Controller Retrofit Project Goal  Complete a Standalone Generator Controller Retrofit Project Scope Retrofit failed generator control panel Removal of old controller and associated wiring and circuitry Installation of new control panel and necessary electronic controls Replacement of all engine sending units Replace engine harness wiring Install new voltage regulator Install new governor controller Install new [...]

Generator Replacement

Generator Replacement Project GoalComplete replacement of existing Caterpillar Generator Set with new 1500 kW Cummins Generator set Project Scope Drain oil and coolant from the existing unit Disconnect all electrical cabling from the existing unit Remove silencer from old unit for transport to scrap yard Provide a crane and flatbed truck to remove the existing [...]

Switchgear Retrofit

Turnkey Retrofit of Obsolete Generator Paralleling Switchgear Control System and Auxiliary Equipment Project GoalComplete overhaul of current health care facility back-up power system, to improve system function and satisfy all required codes Project Scope Remove all obsolete ASCO syncropower paralleling switchgear control components Identify, label, and document all existing control wires between the SWGR and [...]

Demand Response Catalyst Installation

Demand Response Catalyst Installation Project GoalAchieve RICE NESHAP compliance, in accordance with 40CFR63 subpart ZZZZ, to allow the facility to continue enrollment in their utility Demand Response program Project Scope Supply and install oxidation catalysts on (4) paralleled 4SLB gas engine generator sets Supply and install CPMS devices on all four catalysts. Supply site specific [...]

701 Union News

Take a look at what's happening within our Union

Learn More

President’s Messsage: CEAC

Check out the most recent news from the President of the Chief Engineers Association of Chicagoland. Lionheart is a proud event sponsor, and supporter of this great community.

Learn More

Request Service